Home > Exhibitors > Exhibition Guide

Exhibition Guide

Distinguished exhibitors:

In order to ensure the smooth progress of the exhibition, this notice is sent to all exhibitors. Please read the following carefully during your busy schedule.

◎Field Management Office

Please go to the site management office at entrance 1B for consultation.

◎ Contacts

If you have any questions, please feel free to contact us:

Exhibitor Services

Mr. Liu Zutao 0531-86512559

technical service

Mr. Long Fei 0531-8887 9943

Reception services

Miss Li Yaoyao 0531-8887 9964

◎ Cost

Exhibitors should pay the exhibition fee in full before entering the exhibition hall, otherwise they will not be allowed to enter the exhibition hall.

The cost of all additional orders must also be paid at the contractor's service desk designated by the General Assembly. Orders are accepted only after all costs have been paid.

◎ Overtime application

If you (or your contractor) need to apply for overtime work, please notify the Exhibition Site Management Office before 16:00 every day and go through the overtime formalities in the Exhibition Hall Customer Service Center.

From 17:00 to 22:00, the overtime cost is 100 yuan per hour below 50 square meters of booth area and 200 yuan per hour within 50-100 square meters of booth area.

Standards over 100 square meters and so on. After 22:00, the booth area is 150 yuan per hour below 50 square meters and 300 yuan per hour within 50-100 square meters.

Please note the change announcement of live broadcasting.

◎ Special booth

The design drawings (including detailed dimension drawings, booth plan drawings, detailed list of materials and related calculation data) of the special exhibition booth must be examined or reviewed by Shandong International Convention and Exhibition Management Co., Ltd. (the main contractor of the conference). Carpets should be laid on the floor to protect the special booth during the exhibition period.

Mr. Long Fei 0531-8887 9943

◎ Construction deposit:

If the contractor designated by the exhibitor is not the contractor designated by the General Assembly, a refundable construction deposit shall be paid to the contractor designated by the General Assembly at the rate of each

The exhibition stand is RMB 2,000 yuan.

After receiving the construction deposit and confirming that the exhibition hall has received the construction management fee, the designated contractor of the exhibition hall will collect the fee according to the standard of 30 yuan per contractor and issue the construction certificate.

All staff who build the booth must wear construction certificates when they work in the exhibition hall.

◎ Standard booth

When the standard booth is posted on the exhibition board, please try to use transparent tape or suspension. Do not use sticky materials to paste.

The staff of the organizing committee have been allocated to the exhibitors according to the standard, and the home contractors have prepared more tables and chairs for rent. Specific price please go to the conference to designate contractor service

Information desk consultation. For you and others to participate in the exhibition smoothly, please do not take from other people's booth, thank you for your cooperation!

The power consumption of each standard booth shall not exceed 300 watts. If there is overload, please go to the designated contractor's service desk for power consumption formalities.

◎ Personal effects

During the exhibition, there are many mobile people. Exhibitors must strengthen their awareness of anti-theft. Please take good care of your booth, exhibits and personal items during the exhibition period.

◎ Clean

The organizers will clean the pavilion corridors, public areas and standard booths. The contractors designated by you should be responsible for the cleaning of the special booths.

◎ Smoke

Smoking is prohibited in the exhibition hall.

◎ Noise control

The sound produced by all kinds of audio equipment shall not exceed 75 decibels.